Welcome to Illinois Concrete Pipe Association


STORM SEWERS

Strength Required for the Respective Diameters of Pipe and Fill Heights over the Top of the Pipe for Storm Sewers (Metric)

. Type 1 Type 2 Type 3 Type 4 Type 5 Type 6 Type 7
Nominal Diameter mm Fill Height:
Greater than 0.3 m  Not exceeding
1 m
Fill Height:
Greater than 1 m Not exceeding
3 m
Fill Heights:
Greater than 3 m Not exceeding 4.5 m
Fill Height:
Greater than 4.5 m Not exceeding
6 m
Fill Height:
Greater than 6 m Not exceeding 7.5 m
Fill Height:
Greater than 7.5 m Not exceeding
9 m
Fill Height:
Greater than 9 m  Not exceeding
10.5 m
250
300
375
NA
IV
IV
NA
III
III
NA
IV
IV
NA
V
V
NA
V-150D
V-145D
NA
V-180D
V-160D
NA
V-190D
V-170D
450
525
600
IV
IV
IV
III
III
III
IV
IV
IV
V
V
V
V
V
V
V-150D
V
V
V-160D
V-150D
V
675
750
825
IV
III
III
III
III
III
IV
IV
IV
V
V
IV
V
V
V
V
V
V
V
V
V
900
1050
1200
III
II
II
III
III
III
IV
IV
IV
IV
IV
IV
V
V
V
V
V
V
V
V
V
1350
1500
1650
II
I
I
III
II
II
IV
IV
III
IV
IV
IV
V
V
IV
V
V
V
V
V
V
1800
1950
2100
I
I
I
II
II
II
III
III
III
IV
IV
IV
IV
IV
IV
V
V
V
V
V
V
2250
2400
2550
2700
I
I
I
I
II
II
II
II
III
III
III
III
IV
IV
IV
IV
IV
IV
IV
IV
V
V
V
V
V
V
V
V


Back Next

|Home| |About ICPA| |Meet Our Staff| |Join ICPA|
|ICPA Directory| |Technical Info| |Web Resources| |Events|


Illinois Concrete Pipe Association
241 North 5th Street
Springfield, IL 62701 USA
Tel: 217.523.7473
Fax: 217.544.0086
Email:
info@il-concretepipe.org
Website:
http://www.il-concretepipe.org